Solaria Instalaciones is presenting a photovoltaic installation proposal to Hotel Mar Azul. This page shows the buyer experience and the live signals the seller would see, without storing anything.

Solaria Instalaciones -> Hotel Mar Azul

A phased solar installation designed for hotel operations

Reviewed and approved by Laura Martin, Senior Sales Engineer, on June 10, 2026

Executive summary

A phased solar installation designed for hotel operations

The proposal covers 126 photovoltaic panels, inverter setup, monitoring and grid paperwork for Hotel Mar Azul. Installation is planned in two phases to avoid disrupting guest operations.

Project scope

Scope built from the customer conversation

Solaria will handle site survey, engineering validation, panel installation, inverter configuration, monitoring setup and post-installation handover.

Products and pricing

Transparent line items with commercial traceability

Each sensitive number can be traced back to the tariff version, discount rule, margin guardrail and conversation input that produced it.

ItemDetailPriceAudit
126 x high-efficiency photovoltaic panelsTier-1 panels, 450W, hotel rooftop configuration€42,840
Inverter and monitoring systemThree-phase inverter, live production dashboard and alerts€11,900
Installation, grid paperwork and commissioningTwo-phase installation, legal paperwork and final handover€18,600
Estimated total€73,340

Financing options

Two financing paths for the buyer

The buyer can approve the proposal upfront or request a financing plan aligned with monthly energy savings.

One-time payment with 40% deposit and 60% on commissioning.
36-month financing plan with optional early repayment after month 12.

Installation timeline

A timeline the buyer can actually follow

Every step separates dependencies, approvals and installation windows so the hotel team knows what happens next.

Week 1

Technical survey and roof access validation

Week 2

Engineering review and final project documentation

Weeks 3-4

Phase 1 installation and inverter setup

Week 5

Phase 2 installation, monitoring and handover

Next steps

Approve the technical survey slot

Solaria recommends confirming the survey window this week to reserve the installation team for July.

Acceptance

Acceptance flow

In the beta, buyers will be able to approve the proposal or request changes from the web proposal while the seller keeps the full audit trail.